Free tool · Money & pay

Charge-out rate calculator for traffic control companies

Work out what one controller-hour really costs your business, from the wage and loadings through super, workers' compensation, payroll tax, unbillable time and overheads, then the rate you need to charge to make the margin you want.

Start nowUse the tool free

No payment, no card. Just your name and email, once.

  • FreeNo card, no trial
  • WorldwideYour country's own rules
  • 7 featuresPaid-hour cost from base rate, casual loading or leave cost, and average penalties and allowances
  • Updated
CR

Charge-out rate builder

For traffic control company owners: work out what one controller-hour really costs you, then the rate you need to charge to cover overheads and make the margin you're aiming for.

Labour (per paid hour). Use your award or agreement rates and your own figures. Example values only.

Overheads (per year) and how many hours you actually bill.

How it's calculated

Paid-hour cost = base × (1 + loading or leave %) × (1 + penalties %), plus the employer's on-costs on that wage (in Australia super, workers' compensation and payroll tax; elsewhere the contributions, payroll taxes and insurance the country's law sets). Because some paid hours can't be billed, the labour cost per billable hour = paid-hour cost ÷ (1 − non-billable %). Overhead per billable hour = annual overheads ÷ billable hours. Charge-out rate = (labour + overhead) ÷ (1 − margin %). The defaults are illustrations, not market rates: confirm on-costs with your accountant, tax office, social security agency and insurer, and pay rates with the labour authority or your agreement.

FREE · NO CARD · NO CATCHBecome a free TrafWise member

One free account unlocks the full results, PDFs and downloads on every tool, and keeps you posted when a rule changes.

  • 1Your name and email
  • 2Enter the 6-digit code we email
  • 3Every tool opens, on every device

This charge-out rate calculator is for traffic control company owners and estimators. It works out what one controller-hour really costs your business, then the hourly rate you need to charge to cover that cost and make the margin you're aiming for.

Most traffic control companies that struggle with cash aren't short of work. They're charging a rate that looked fine against the wage but didn't cover super, workers' comp, payroll tax, unbillable hours and the office. This calculator puts all of that in one place.

How it's worked out

The calculator builds the rate in five steps:

  1. Paid-hour wage = base rate × (1 + casual loading or leave cost) × (1 + average penalties and allowances).
  2. On-costs = paid-hour wage × (super + workers' comp + payroll tax). Paid-hour cost = wage + on-costs.
  3. Labour per billable hour = paid-hour cost ÷ (1 − unbillable %). Some paid hours (travel, inductions, rain-offs, standby) can't be billed, so the hours you can bill have to carry them.
  4. Overhead per billable hour = annual overheads ÷ billable controller-hours per year. Break-even rate = labour + overhead.
  5. Charge-out rate = break-even ÷ (1 − target margin).

The result shows the charge-out rate, a bar splitting it into wage, on-costs, overheads and margin, the cost per paid hour, the break-even rate, and a table of rates and profit per hour at 5%, 10%, 15%, 20% and 25% margin. The unbillable share and the margin are each capped at 90% so the maths can't divide by zero.

Margin is not markup

The calculator works in margin: profit as a share of the price. Plenty of people price with markup: profit as a share of the cost. They're different numbers:

Markup on costMargin on price
10%9.1%
15%13.0%
20%16.7%
25%20.0%
33.3%25.0%

A 25% markup is a 20% margin. If you think you're making 25% but you're adding 25% to cost, you're making 20%. Our guide to how to calculate your charge-out rate goes through this with more examples.

Charge-out rate calculator example from the award

A company employs casual controllers on the Building and Construction General On-site Award 2020 (MA000020). From 1 July 2026 the base rate for CW1(a) is $26.67 an hour, and the industry allowance of $67.15 a week adds $67.15 ÷ 38 = $1.77 an hour, so the all-purpose rate is about $28.44.

The owner enters:

  • base rate $28.44, casual loading 25%
  • average penalties and allowances 10% (their own figure from last year's payroll)
  • super 12%, workers' comp 1.343% (the WorkCover Queensland average; their own policy rate will differ)
  • payroll tax 0%, because they're under the threshold
  • overheads $250,000 a year over 20,000 billable controller-hours
  • 8% of paid hours unbillable, and a 15% target margin
StepResult
Paid-hour wage$28.44 × 1.25 × 1.10 = $39.11
On-costs (13.343%)$5.22
Cost per paid hour$44.32
Labour per billable hour (÷ 0.92)$48.18
Overhead per billable hour$250,000 ÷ 20,000 = $12.50
Break-even rate$60.68
Charge-out rate at 15% margin$60.68 ÷ 0.85 = $71.38

That leaves about $10.71 profit per billable hour. If the business grows past the payroll tax threshold and pays 5.45% (the NSW general rate reported by secondary sources), the break-even rises to $62.99 and the rate for a 15% margin to $74.11. That's why payroll tax belongs in the rate before you cross the line, not after.

This is weekday straight time. Nights, weekends and public holidays carry higher penalty rates, so price them separately: change the penalties figure and rerun it for each band.

Where the inputs come from

InputWhere to get itNotes
Base rateYour award or enterprise agreementMany crews are on agreements well above the award
Casual loadingMA000020 cl. 12.4: 25%For permanent staff, use leave and RDO costs instead
Penalties and allowancesYour own payroll historyCivil construction night shift is 115%; general building is 150%
Super12% Superannuation GuaranteePayday Super since 1 July 2026: due within 7 business days of payday
Workers' compYour policyQLD average $1.343 per $100 of wages; VIC average 1.8%
Payroll taxYour state revenue officee.g. NSW $1.2M threshold at 5.45%, QLD $1.3M at 4.75%; check the current figures
OverheadsYour accountsOffice, allocators, insurance, software, vehicles, equipment, training

The penalty loadings matter more than most people think. The award has two shift streams: the civil construction stream pays night shift at 115% (130% for permanent nights, 150% if the night shifts don't run 5 in a row), while general building pays 150%. Pricing night work on the wrong stream means either underpaying the crew or undercharging the client. Our guide to paying traffic controllers correctly explains which applies.

Payroll tax thresholds and rates differ by state, and the Victorian, SA and NT thresholds conflict between the sources we checked, so confirm yours with the state revenue office.

What market rates tell you

Published industry guides put a certified traffic controller at roughly $50 to $85 per hour on weekday straight time. Those are marketing figures from individual companies, not a rate card. Your rate has to come from your own costs. If your break-even is close to what the market pays, the answer is usually in the inputs: unbillable hours, overheads spread over too few billable hours, or penalties not passed through.

Ways to improve the rate without raising the price

  • Cut unbillable time. Every point off the unbillable share drops the labour cost per billable hour. Better rostering, fewer wasted travel hours and clear rain-off terms all help.
  • Bill the minimums. Make sure short jobs are charged at your minimum and late cancellations are charged under your terms. Our guide to hourly versus fixed-price traffic control compares the options.
  • Spread overheads. More billable hours on the same overheads lowers the overhead per hour.
  • Price each band. Work out separate rates for nights, Saturdays, Sundays and public holidays.

For a fuller on-cost breakdown, including leave, RDOs, PPE and training, use the labour cost calculator. To turn the rate into a client quote, use the traffic control quote builder, and to see the client's side of the same sum, try the traffic control cost estimator.

When to get professional advice

The calculator's defaults are illustrations, not market rates. Before you set prices:

  • check pay rates and loadings with the Fair Work Ombudsman, or your enterprise agreement
  • confirm super obligations and Payday Super timing with the ATO
  • check payroll tax with your state revenue office, including grouping rules
  • get your workers' compensation rate from your insurer or state scheme
  • talk to your accountant about overheads, cash flow and pricing

This is a planning tool, not financial advice.

Frequently asked questions

How do you calculate a charge-out rate?

Add up the full cost of a billable hour, wage plus on-costs plus a share of overheads, then divide by (1 − margin). A $68.46 cost per billable hour at a 15% margin gives a charge-out rate of $80.54.

What is the difference between margin and markup?

Margin is profit as a share of the price; markup is profit as a share of the cost. A 25% markup on $60 gives $75, which is a 20% margin. The calculator works in margin, so enter the margin you want, not the markup.

What does a traffic controller cost per hour under the award?

From 1 July 2026 the base rate for CW1(a) under the Building and Construction General On-site Award is $26.67 an hour plus an industry allowance of $67.15 a week, about $28.44 an hour. With the 25% casual loading that's about $35.55 an hour, before super, workers' comp and penalties.

What super rate should I use?

The Superannuation Guarantee is 12%. Since 1 July 2026, Payday Super means it must reach the fund within 7 business days of each payday, so it's a weekly cash cost, not a quarterly one.

What do traffic control companies charge per hour?

Published industry guides give roughly $50 to $85 per controller-hour on weekday straight time. Those are marketing figures, not a rate card. Your own costs decide what you can afford to charge.

What workers' compensation rate applies to traffic control?

It depends on your state and industry class, and we haven't found a published class rate for traffic control. As a guide, WorkCover Queensland's average premium is $1.343 per $100 of wages and WorkSafe Victoria's average is 1.8%. Use the rate on your own policy.

Sources and standards

Rules last checked . Spotted a change? Tell us.

Free member? Unlock every result