Free tool · Safety & compliance

Traffic control checklists for every stage of the shift

Four field checklists for the start, middle and end of a traffic control shift, plus one for clients booking a crew. Tick them on screen or print a clean copy for the ute. They support your company's own forms and the TGS; they don't replace them.

Start nowUse the tool free

No payment, no card. Just your name and email, once.

  • FreeNo card, no trial
  • WorldwideYour country's own rules
  • 6 featuresPre-start and set-up checklist with 12 checks, from the TGS and permits to the drive-through
  • Updated
11

Printable checklists

Field checklists for the start, middle and end of a shift. Tick them on screen or print a clean copy for the vehicle. They support your company's own forms and the approved traffic plan; they don't replace them.

Read more: Pre-start checks for traffic control crews · Roadworks after-care checklist · 12 questions before you book a traffic control company

FREE · NO CARD · NO CATCHBecome a free TrafWise member

One free account unlocks the full results, PDFs and downloads on every tool, and keeps you posted when a rule changes.

  • 1Your name and email
  • 2Enter the 6-digit code we email
  • 3Every tool opens, on every device

These traffic control checklists cover the start, middle and end of a shift on a road work site, plus a list for clients getting ready to book a crew. Tick them on screen as you go, or print a clean copy for the ute. They're short on purpose: the things that get missed when a crew is rushing to set up before the permit window opens.

They support your company's own forms, the safe work method statement (SWMS) and the traffic guidance scheme (TGS). They don't replace them. Where your project, client or state asks for something specific, that comes first.

How it's worked out

There's no calculation here. Each checklist is built around the order the work actually happens in, and the checks the rules expect on site:

  • Pre-start and set-up (12 checks): paperwork, people, gear and the set-up itself, finishing with a drive-through from the driver's view.
  • During the shift (10 checks): inspections, devices, queues, access for pedestrians and emergency vehicles, breaks, weather and changes.
  • Pack-down and after-care (9 checks): removal in reverse order, after-care devices, a final drive-through, equipment, timesheets and handover.
  • Client booking (9 checks): what a builder, council or event organiser should have ready before calling a traffic control company.

How the tool behaves:

  1. Pick a list from the tabs. Only that list shows.
  2. Tick items as they're done.
  3. Print this checklist prints only the list on screen, without the rest of the page.
  4. Untick all clears the list on screen for the next shift.

Ticks aren't saved or sent anywhere. If you need a record, write the times and names on your company's forms or the site copy of the TGS.

The four traffic control checklists at a glance

ChecklistWhenWhoChecks
Pre-start and set-upBefore any device goes outTeam leader, implementer, every controller12
During the shiftAt each inspection and whenever something changesTeam leader, controllers10
Pack-down and after-careWhen the work area is safe to clearTeam leader, implementer9
Client bookingBefore calling a traffic control companyBuilder, council, event organiser9

That's 40 checks in all. The first three are for every shift. Our guide to pre-start checks for traffic control crews explains each pre-start item in more detail.

What the rules expect on site

Several of the checks come straight from the rules. In NSW, Transport for NSW's TS 05492 Traffic Control at Work Sites (June 2026) replaced the old TCAWS manual and sets these on-site checks:

  • Sight distance to a controller. A traffic controller must be able to see at least 1.5 × D to oncoming traffic, where D is the approach speed read as metres. At 60 km/h that's 90 m. The sight distance check measures it with your phone.
  • Moved signs. Any sign moved from where the TGS shows it must be marked and initialled on the TGS held on site (s14.11.3). Changes beyond the allowed tolerances need the TGS designer's approval.
  • Night lighting. The implementer, works supervisor or team leader checks lighting by driving through in every direction, on every carriageway (s12.3.5). Signs and devices used at night must be inspected at night.
  • Queues. Queue estimates should be checked on site and monitored through the shift (s11.8.3).
  • Portable traffic signals. Initial timings are tuned on site: switch on, watch three cycles, then adjust all-red and green times (Appendix A.4).

The SWMS is required in every state that has adopted the model WHS laws. Construction work on or next to a road used by traffic is high risk construction work, and the SWMS has to cover the specific site and say how its controls are put in place, monitored and reviewed. Victoria has its own OHS laws with similar requirements. Our guide to the SWMS for traffic control covers what goes in it, and the SWMS builder helps write one.

A worked example: a night lane closure

A crew of three is closing a lane on a 60 km/h road from 21:00 to 05:00, with a team leader who is also the implementer.

Pre-start, 20:15. The team leader confirms the TGS matches tonight's stage and the road occupancy approval allows 21:00 to 05:00. Everyone signs the SWMS. Radios are tested at both controller positions. The night hi-vis is on. The cone count from the traffic cone calculator is 26 per stage, and the ute has 29. Set-up starts with the advance signs.

Set-up check, 21:10. The controller position is checked for 1.5D: 90 m at 60 km/h. One advance sign has to move 8 m because of a driveway. It's marked and initialled on the TGS. The team leader drives through in both directions to check the lighting and records the time.

During the shift. Inspections are done at the intervals the project requires, with times recorded. At 23:40 a cone in the taper has been struck and is replaced. At 01:00 the crew takes a rest break, rotating one controller at a time.

Pack-down, 04:20. The work area is cleared first, then the buffer, the taper and finally the advance signs. A final drive-through confirms nothing is left in the lane, and the reopening time is recorded at 04:52. Equipment is counted back on, one damaged sign is tagged out, and the docket is signed by the client's site contact.

Incidents during the shift

The during-the-shift list includes reporting incidents, near misses and abuse the same shift. If something serious happens, the rules are strict. A death, a serious injury or illness, or a dangerous incident must be notified to the regulator straight away. The site must be left undisturbed except to help people or make it safe, and records kept for 5 years. Victoria uses different laws with different section numbers, so check your state regulator's guidance.

Using the client booking checklist

The booking list is for the person hiring the crew. Having these answers ready gets a faster, more accurate quote:

  • the exact address and section of road, with a map or photos
  • the work, how long it takes, and the plant and trucks involved
  • dates, start time, expected finish and any approved work-hour limits
  • who owns the road and whether a permit or road occupancy licence is needed
  • whether a TGS or traffic management plan exists, and who prepares it
  • pedestrian, cyclist, driveway and bus stop impacts
  • a site contact and who signs the docket
  • a purchase order and invoicing details
  • cancellation terms, minimum charges and the wet weather policy, in writing

Our guide to the 12 questions to ask before you book a traffic control company goes further, and the traffic control cost estimator helps set a budget.

When to get professional advice

These are general checklists. Get advice from your WHS adviser, the TGS designer or your state regulator when:

  • the site doesn't match the TGS and needs more than a small move within tolerance
  • the work involves high speeds, motorways, rail crossings or other high-risk settings
  • there's been an incident, a near miss or a vehicle intrusion
  • your client or principal contractor requires their own forms or audits

Our roadworks after-care checklist covers what to leave in place overnight once the crew goes home.

Frequently asked questions

What should be on a traffic control pre-start checklist?

The current TGS and permits, a signed SWMS, everyone's tickets and fitness for work, PPE, radios tested, escape routes, the vehicle pre-start, enough clean devices, the set-up order and a drive-through check. The pre-start list here has 12 checks covering those.

Is a SWMS required for traffic control?

Yes. Construction work on or next to a road used by traffic is high risk construction work under the model WHS Regulations, so a SWMS that covers the specific site is required. It has to say how the controls are put in place, monitored and reviewed.

What order do you set up and remove traffic control?

Set up in the direction traffic travels: advance warning signs first, then the taper, buffer and work area. Pack down in reverse: work area, buffer, taper, then the advance warning signs last, so drivers are warned until the end.

What if a sign has to be moved from where the TGS shows it?

In NSW, TS 05492 s14.11.3 says any moved sign must be marked and initialled on the TGS held on site. Changes beyond the allowed tolerances need the approval of the PWZ-qualified TGS designer.

Who checks the lighting on a night job?

In NSW, TS 05492 s12.3.5 says the implementer, works supervisor or team leader checks the lighting by driving through in every direction. Signs and devices used at night must be inspected at night.

What do I need before booking a traffic control company?

The exact address and section of road, the work and plant involved, dates and hours, who owns the road and what permits are needed, whether a TGS exists, impacts on pedestrians and driveways, a site contact, a purchase order and agreed cancellation terms. The booking list covers all 9.